الشركة المصنعة لباب الدش في الصين للمشاريع, بالجملة, ودعم صانعي القطع الأصلية.

10-Step Production Workflow · Fully Traceable

A Transparent, Traceable Shower Door Manufacturing Process

From Xinyi glass raw sheets to container loading, every order moves through 10 documented steps and four in-house workshops. This isfactory-visit contentyou can read before you commit: see how material, حَشد, inspection, packing, and shipment are controlled inside our 15,000Foshan factory.

Technician measuring the width of a frameless glass shower door with a tape measure before installation
★★★★★

“Knowing how each batch moved through the line kept our delivery on schedule.” — Kevin, Project Buyer

15,000 Self-Owned Foshan Factory
1,000 مجموعات / mo Flexible Monthly Capacity
4 workshops Full-Chain In-House Control
25+ سنين Manufacturing Experience
The 10-Step Production Workflow

Follow one order from aluminum to container.

Every batch follows the same 10-step sequence. Each step lists what happens on the floor and the quality-control checkpoint that gates itthe level of detail buyers normally need a factory visit to confirm.

Aluminum material preparation

Aluminum profiles are received, checked against the approved specification, and staged for the order batch before any cutting begins.

QC checkpoint: incoming material verificationprofile spec, finish, and order configuration confirmed against the approved program before release to the line.

Automatic cutting

Profiles are cut to length on the CNC double-head cutting saw, so repeated dimensions stay consistent across the whole batch.

QC checkpoint: cut length and angle accuracy are measured so downstream assembly starts from correct, repeatable dimensions.

Automatic grooving

Cut profiles are grooved on automated equipment so glass channels and fitting seats are positioned ready for assembly.

QC checkpoint: groove position and depth are verified to keep glass fit and hardware seating consistent unit to unit.

Semi-finished assembly

Profiles and hardware are pre-assembled into frame sub-structures before they meet the glass.

QC checkpoint: sub-assemblies are matched to approved specificationsnot improvisedso version control stays visible on the shop floor.

Glass material preparation

Glass is processed in-house from Xinyi (信义) glass raw sheets, cut and prepared to the order’s confirmed dimensions and configuration.

QC checkpoint: raw-sheet source and glass specification are controlled in-house, keeping material origin and configuration traceable.

Glass quality inspection

Processed glass is inspected after tempering, including the tempered-glass safety check that confirms it breaks safely.

QC checkpoint: tempering is verified against ANSI Z97.1 (نحن), في 12150 (أوروبا), and AS/NZS 2208 (أستراليا).

Finished-product quality testing

Assembled doors undergo functional and structural testing before they are allowed to move to packing.

QC checkpoint: impact testing on the structure plus a 100,000-cycle push-pull test on rollers confirm safe operation and durability.

التعبئة والتغليف

Finished units are packed in standardized honeycomb cartons with reinforced wooden crates, cushioning and separation matched to transport risk.

QC checkpoint: packaging drop testing validates transit protection; labeling supports room-based, zone-based, or mixed-SKU sorting.

Warehousing

Packed orders are staged and sorted in the warehouse according to the buyer’s delivery logic before loading.

QC checkpoint: sorting and identification are checked so room numbers, zones, or SKU groups stay organized for the buyer’s site.

Container loading & shipment

تم التحقق منه, sorted cartons are loaded into containers in a sequence that preserves the buyer’s unloading and installation order.

QC checkpoint: loading readiness is confirmed so the delivery sequence and documents — تقرير مراقبة الجودة, SGCC / CE certificate copyleave together.
Four Workshops, One Factory

The full production chain, under our roof.

ال 10 steps run across four dedicated workshops inside the same 15,000㎡ منشأة. Critical decisions about glass, aluminum, حَشد, and packaging are never outsourcedincluding processing Xinyi glass raw sheets ourselves instead of buying finished glass.

KJbath worker with mask and earplugs operating a DEI CNC machining center with orange housing and touchscreen panel
Workshop 01

Aluminum processing

Profile preparation, CNC cutting, grooving, and drilling for frames and hardware mountingthe dimensional foundation of every door.

Robotic vacuum suction arms lifting large glass panels in the KJbath factory with glass storage racks and forklift behind
Workshop 02

Glass deep-processing

Xinyi glass raw sheets are cut, edged, drilled, and tempered in-house, keeping safety-glass quality and material origin under our control.

Technician measuring the width of a frameless glass shower door with a tape measure before installation
Workshop 03

حَشد

زجاج, profiles, and hardware are assembled into finished units against approved specifications, مع functional checks قبل التعبئة.

Kraft paper wrapped shower wall panel packages with yellow straps on conveyors ready for shipping in the KJbath factory
Workshop 04

Automated packaging line

Standardized honeycomb cartons and reinforced wooden crates run on an automated line, sorted and labeled to the buyer’s delivery logic.

15,000 Self-owned Foshan factory
1,000 مجموعات / mo Flexible monthly capacity
151 people 20 مبيعات · 12 ر&د · 120 إنتاج
25+ سنوات Manufacturing since 1999
Key Equipment

The machines behind repeatable accuracy.

Since our 2011 capacity upgrade, the line has been built around dedicated CNC and automated equipment. The point is not impressive machine namesit is that repeated dimensions, holes, and packaging stay consistent across a 1,000-set month.

CNC double-head cutting saw

Cuts aluminum profiles to length and angle so repeated dimensions stay batch-consistent from the first unit to the last.

TUTO MAX CNC precision machine

Handles precision machining of profiles and fitting seats for tight, repeatable tolerances on hardware mounting.

Pneumatic multi-head drilling machine

Drills multiple holes in one pass, keeping hardware mounting positions consistent across the whole batch.

Automated packaging line

Standardizes carton forming and packing so protection and labeling stay uniform across orders.

منذ 2011 Capacity upgrade with CNC double-head cutting saw, TUTO MAX CNC precision machine, and pneumatic multi-head drilling machinethe foundation of batch-after-batch consistency.
KJbath factory worker in blue uniform pressing buttons on an AUTO-MAX CNC machine control panel
CNC control panel on the aluminum processing line
سعة & Flexibility

Built for steady volume and flexible orders.

The four-workshop layout supports 1,000 sets per month with flexible production, so project orders and channel orders run side by side without one blocking the other. Full-chain control shows up in three concrete places on every order.

1,000 sets/mo Flexible monthly capacity
10 sets MOQ Main modelsJL712, JL139, JK1934, JP0206, JP0204, MODEL D, JP103
15 / 30 / 20–25 أيام عينة / first mass order / reorder lead times
يكلف

Full-chain cost, fewer middle margins

Because aluminum, زجاج, حَشد, and packaging are produced in-houseincluding processing Xinyi glass raw sheets ourselvesthe order is not stacked with separate supplier margins at each handoff.

مهلة

Predictable, honest delivery

One team controls the whole sequence, so lead times stay dependable: samples in 15 أيام, first mass order in 30 أيام, and repeat orders in 20–25 أيام — without waiting on outside processors.

Quality Stability

Consistent quality batch after batch

In-house control keeps standards uniform: ايزو 9001 / 14001 / 45001 أنظمة, SGCC and CE certification, and hardware salt-spray testing to 96h (معيار) or 240h (coastal) for repeat-batch consistency.

Confirm Capacity and Lead Time for Your Order تم الرد على كل استفسار دولي في الداخل 12 ساعات.
الأسئلة الشائعة

Frequently asked questions about the عملية التصنيع

Six questions buyers ask most often about the manufacturing processcovering process stability, full-chain control, glass verification, المرونة, and how it differs from Quality Control. اضغط على سؤال لقراءة إجابتنا القياسية.

Why does the manufacturing process matter to non-technical buyers?

For importers and distributorsBecause process stability affects consistency, lead-time predictability, packing readiness, and how repeatable the finished product will be across batches.

Should this page focus only on machinery?

For sourcing teamsلا. A useful process page should show preparation, حَشد, functional review, packing, and shipment coordination instead of trying to impress buyers with equipment names alone.

How is Manufacturing Process different from Quality Control?

For project buyersManufacturing explains how the order moves through production. Quality Control explains how risks are checked, escalated, and stopped before they become shipment problems.

What doesfull-chain controlmean for my order?

For brand owners and importersIt means aluminum processing, المعالجة العميقة للزجاج, حَشد, and packaging all happen in-house, and we process Xinyi glass raw sheets ourselves. Nothing critical is outsourced, which keeps cost, مهلة, and quality stable across every batch.

How is the glass processed and verified?

For engineering and compliance teamsGlass is cut and tempered in-house from Xinyi raw sheets, then verified against ANSI Z97.1 (نحن), في 12150 (أوروبا), and AS/NZS 2208 (أستراليا). Each order ships with a QC report covering tempering, تأثير, and salt-spray data.

Can the factory handle flexible or mixed-model orders?

For e-commerce sellers and project buyersنعم. Monthly capacity is 1,000 sets with flexible production, and MOQ starts at 10 sets for main models. Packaging can be sorted by room, zone, or SKU to match your delivery logic.

العودة إلى الأعلى
بحاجة إلى اقتباس سريع? قم بالدردشة مع فريق التصدير لدينا على WhatsApp.