...

China-Hersteller von Duschtüren für Projekte, Großhandel, und OEM-Unterstützung.

5 QC Tests · Data Verified Before Shipment

Verifiable Qualitätskontrolle: 5 Tests, Real Data, on Every Order

Quality at KJbath is measured, not promised. Every shower door order passes five QC tests – Temperierung, Auswirkungen, Verpackungsabfall, Salzsprühnebel, and 100,000-cycle roller push-pull – and ships with a QC report (Temperiergeschwindigkeit, impact and salt spray data) weitere Kopien des SGCC/CE-Zertifikats. Third-party inspection by SGS, TUV, or your own nominee is welcome before shipment.

Techniker bedient eine Salzsprühtestkammer, um die Korrosionsbeständigkeit der Duschkabinen-Hardware zu prüfen
★★★★★

“Seeing each inspection step gave us confidence to approve volume orders.” — Laura, Sourcing Manager

5 QC tests Run on Every Order
100,000 Zyklen Roller Push-Pull Endurance
96-240H Salzsprühbewertung · Standard to Coastal
ISO 9001 Certified Quality Management System
Der 5 QC Tests

Five inspections, ranked by what they cost buyers.

Not every defect carries the same risk. We weight QC toward the failures buyers fear most — glass safety and packaging integrity — and back each test with named equipment and recorded data. The stars show how heavily project buyers weigh each item.

Test 01 · Glass Installability & Sicherheit ★★★★★

Tempering test: anti-shatter safety glass you can prove

Our tempering test machine verifies that tempered glass breaks into small, blunt granules instead of sharp shards — the core of our Anti-Shatter Safety Glass program. Glass starts from Xinyi originals, and the tempering rate is measured and recorded for each batch.

Lowers the risk of glass breakage and failed acceptance on hotel and apartment projects, with SGCC (Nordamerika) and CE (Europa) certified glass programs. Tempering-rate data lands in your QC report.

Tempering test machine ANSI Z97.1 IN 12150 AS/NZS 2208
Worker striking tempered glass with a hammer and punch during a shatter safety test on the factory floor
Test 02 · Shower Door Structure ★★★★★

Schlagtest: structure that holds up in high-traffic use

The impact test machine loads the assembled door — Glas, Profile, Scharniere, und Hardware — to confirm the structure absorbs real-world knocks without failure. This is the difference between a showroom sample and Fünf-Sterne-Hotelstandard Haltbarkeit.

Structural weakness is caught before shipment, not discovered by an installation crew on a busy hotel site. Impact results are part of the per-order QC report, so acceptance is evidence-based.

Impact test machine Assembled-door test
Metal impact tool striking green tempered glass with radial cracks demonstrating shower glass strength
Test 03 · Export Packaging ★★★★★

Drop test: packaging engineered to survive the journey

Packaged units go through a drop test so the protection is proven before loading. Standard export packing combines a honeycomb carton with a reinforced wooden frame, tuned to the transport risk of each channel.

Für E-Commerce-Verkäufer (Amazonas / Wayfair), drop-validated packaging directly lowers the logistics damage rate that eats margin and reviews. For projects, Zimmer- and zone-labeled packing — the logic we used on Canada’s 26-set MAGUIRE apartment project — cuts on-site sorting and rework.

Drop-test rig Wabenkarton + wooden crate
Holzkisten für den Export mit der Aufschrift „SHOWER DOOR“ und 8-mm-Klarglasscheibendetails, FRAGILE Symbole und grüne Umreifung
Test 04 · Hardware-Finish ★★★★★

Salzsprühtest: corrosion resistance measured in hours

In the salt spray chamber, Scharniere, Griffe, Rollen, and profiles are rated at 96 hours as standard and up to 240 hours for coastal specification — the backbone of our Corrosion-Resistant PVD Coating hardware programs.

96h suits hotels and high-humidity commercial bathrooms; 240h suits coastal resorts — the same thinking behind the salt-air hardware on Australia’s Waterview Beach Apartment project. A 96h claim is only credible with the report behind it, so salt spray data is included in every QC report.

Salt spray chamber 96h-Standard 240h Küste
Techniker bedient eine Salzsprühtestkammer, um die Korrosionsbeständigkeit der Duschkabinen-Hardware zu prüfen
Test 05 · Sliding Rollers ★★★★★

Push-pull test: 100,000 cycles of smooth running

Rollers and sliding mechanisms run through 100,000 Auf-Zu-Zyklen on the push-pull test machine — unser 100,000 Cycles Smooth Running benchmark — so a sliding door still glides after years of guest use.

Fewer jammed doors, fewer after-sales complaints, and fewer warranty claims across the installed base — endurance data that underpins our 5-year shower door warranty.

Push-pull test machine 100,000 Zyklen
Techniker führt mit einem digitalen Kontrollgerät einen Push-and-Pull-Funktionstest an einer Duschtür-Glasscheibe durch
QC Workflow

Four inspection gates, from incoming material to loading.

QC is not a single final check. It is a sequence of gates that follows your order through our 10-step production flow, so a problem is stopped where it is cheap to fix — not after the carton is closed.

1

Incoming inspection

Xinyi glass originals, Aluminium, Hardware, and components are checked against the approved specification before they enter the line — wrong materials never reach the batch.

2

Process inspection

Checkpoints across cutting, groovend, Montage, and glass QC catch repeat issues early — before they spread across more units than a buyer can sort out later.

3

Finished-product inspection

Assembled units are reviewed for fit, function, and appearance, and the tempering, Auswirkungen, and salt spray data is captured before packaging.

4

Inspektion vor dem Versand

Packaging drop validation, carton and wooden-frame checks, and labeling review — any failure stops the batch instead of drifting into shipment.

Test Equipment

In-house equipment, not outsourced claims.

Every number in our QC report comes from equipment we operate ourselves, inside a 15,000㎡ factory run by a 151-person team with full supply-chain control across four workshops. That is what makes the data verifiable.

Tempering test machine

Verifies tempered safety glass breakage and the Temperiergeschwindigkeit recorded for every batch.

Impact test machine

Loads the assembled door structure — Glas, Profile, Scharniere, Hardware — under controlled impact.

Salt spray chamber

96H / 240H

Rates hinges, Griffe, Rollen, and profiles at 96h-Standard Und 240h for coastal specification.

Push-pull test machine

100,000 Zyklen

Runs sliding rollers through 100,000 Auf-Zu-Zyklen to confirm smooth, silent operation.

Drop-test rig

Validates honeycomb-carton + wooden-crate export packaging against real transport risk.

15,000㎡ Eigene Foshan-Fabrik
151 Menschen 120 in der Produktion
4 Werkstätten Full in-house chain
3 Systeme ISO 9001 · 14001 · 45001
Per-Order Documentation

The evidence travels with the goods.

QC only protects a buyer if the evidence ships with the container. Every KJbath order leaves with a documentation package your inspector and your channel can use immediately.

QC-Bericht

Tempering rate, Auswirkungen, and salt spray data recorded for the batch you receive.

SGCC / Kopie des CE-Zertifikats

Safety glass compliance evidence for North America and Europe.

Illustrated installation manual

Professional, diagram-led guidance for site crews.

Spare parts pack

Rollers and sealing strips for fast after-sales service.

Exportverpackung

Standardized honeycomb carton plus reinforced wooden frame, labeled to your delivery logic.

TUV Rheinland test report page for Kang Jian shower enclosures tested according to EN 14428:2004+A1:2008
Testbericht eines Drittanbieters — Duschabtrennungen geprüft nach EN 14428
Third-Party Verification

Your inspector is welcome.

Verifiable quality means you do not have to take our word for it. We routinely open the factory to independent verification before shipment — and keep your designs confidential while we do.

✓

SGS, TÜV, or your nominee

We coordinate pre-shipment inspection with the third-party partner your order requires — SGS, TÜV, or your own appointed inspector.

✓

Remote-friendly evidence

QC reports and certificate copies are shared so your team can review without flying in — a factory-visit substitute when travel is not possible.

✓

NDA protection

Exclusive designs are covered by an NDA, und Ihre benutzerdefinierten Formen werden nur für Ihre Nachbestellungen aufbewahrt — never reused for another buyer.

Prüfzeichen des SGCC Safety Glazing Certification Council SGCC · Nordamerika
CE-Sicherheitszertifizierungszeichen der Europäischen Union CE · Europa
AS/NZS 2208 Australisches und neuseeländisches Glasstandardzeichen AS/NZS 2208 · Oceania
ISO 9001 Zertifizierung des Qualitätsmanagementsystems ISO 9001 · 14001 · 45001
Glass standards by market ANSI Z97.1 (Vereinigte Staaten) · IN 12150 (Europa) · AS/NZS 2208 (Australien) — with SGCC / CE certificate copies and matching QC data in every order. Backed by a 5-year shower door and 3-year hardware warranty, 24-Stunde technischer Support, and 12-hour inquiry response.
FAQs

Häufig gestellte Fragen zu Qualitätskontrolle

Six questions buyers ask most often about quality control – covering QC scope, Inspektion durch Dritte, per-order documentation, salt spray ratings, and packaging drop testing. Tippen Sie auf eine Frage, um unsere Standardantwort zu lesen.

Is QC just the last inspection before shipment?

For serious buyersNEIN. QC should include incoming review, in-process checkpoints, assembly review, packaging checks, and escalation logic when something does not match the approved standard.

Can you coordinate third-party inspection before shipment?

For importers and project teamsJa. We can coordinate pre-shipment inspection with the buyer’s appointed third-party inspection partner when the order requires it.

Why does Quality Control need its own page?

Für EinkaufsmanagerBecause buyers do not only care how products are made. They also need to understand how defects are prevented from becoming shipment problems after the order is already committed.

What QC documentation do you provide with each order?

For compliance and QA teamsJeder Bestellung liegt ein QC-Bericht bei, in dem die Temperierungsrate aufgeführt ist, Auswirkungen, and salt spray data for the batch, plus an SGCC/CE certificate copy, eine bebilderte Installationsanleitung, und ein Ersatzteilpaket (Rollen und Dichtungsstreifen). Your inspector has supporting evidence on day one.

What salt spray rating do hotel or coastal projects need?

For hotel and resort buyers96 hours is our standard rating for hotels and high-humidity commercial bathrooms; 240 hours is specified for coastal and marine environments. The salt spray data is recorded in the QC report, so the rating is evidence, not a claim.

How does the packaging drop test protect e-commerce sellers?

For Amazon and Wayfair sellersDrop-validierte Verpackung – einem standardisierten Wabenkarton plus einem verstärkten Holzrahmen – lowers the logistics damage rate that drives returns and negative reviews, protecting your margin on every shipment.

Zurück nach oben
Benötigen Sie ein schnelles Angebot? Chatten Sie mit unserem Exportteam auf WhatsApp.
    • English
    • العربية
    • Français
    • Deutsch
    • Italiano
    • Русский
    • Español
    • ภาษาไทย