Fabricant chinois de portes de douche pour projets, de gros, et assistance OEM.

Five-Star Hotel Standard · SGCC & CE Certified

Hotel Shower Door Manufacturer for Five-Star Hospitality Projects

Engineered for Excellence, Trusted by Five-Star Hotels. From a 10-set sample run to 1,000 ensembles de capacité flexible mensuelle, we help hotel & apartment contractors pass inspection, prevent glass failures, and cut on-site reworkbacked by SGCC/CE certified tempered glass and a DFM structural review before production starts.

Aerial view of a luxury resort with oval turquoise pool, hot tubs, lounge chairs and white red-tile-roof buildings
★★★★★

“Health solved more than procurementthey made our whole bathroom system easier to install and easier to maintain.” – Olivia Bennett, Projet d'appartement MAGUIRE (Canada)

25+ yrs Hotel-Grade Manufacturing Since 1999
15,000 Owned Foshan Factory, Full In-House Chain
1,000 ensembles Monthly Flexible Project Capacity
190+ des pays Export Experience Worldwide
Risque & Résolution

What Derails Hotel ProgramsEngineered Out Before Production

On a hospitality program, one failed inspection, one shattered panel, or one batch of mis-fitting doors can stall an entire opening. These are the three risks contractors raise with us mostand the answers we build into every order.

Risque 01 – Conformité
Le risque

Failing the safety glass inspection

Inspectors in North America and Europe ask for certified glazing and documented proof. Missing paperwork stalls handover as surely as missing glass.

Comment nous le supprimons

SGCC + CE glass, documented by order

We supply SGCC (Conseil de certification des vitrages de sécurité) certified tempered glass for North America and CE-marked glass for Europe, aligned with ANSI Z97.1 and EN 12150. Every order ships with a QC report, certificate copies, and test dataso your inspector has evidence on day one.

SGCC CertifiedCE MarkedANSI Z97.1DANS 12150
Risque 02 – Sécurité
Le risque

Glass breakage in guest rooms

A spontaneous breakage in an occupied hotel room is a safety incident, a liability claim, and a brand problemall at once.

Comment nous le supprimons

Xinyi substrates + controlled tempering

Every program starts from Xinyi glass substrates and runs a controlled tempering process, verified by tempering (fragmentation) and impact testing in our own lab. Anti-shatter safety glass is backed by a 5-year shower door warranty.

Xinyi Glass SubstratesTemper + Impact Tested5-Year Door Warranty
Risque 03 – Installation
Le risque

Drawings that don’t install

Waterproofing blind spots, tolerance drift, and opening conflicts discovered on site become rework across hundreds of identical bathrooms.

Comment nous le supprimons

DFM pre-check + room-numbered packing

Before cutting, our engineers run a DFM structural review of your CAD drawings and return a Value Engineering proposal within 24 heures. Then we pack by room number, produit, and installation positionthe discipline we used on the 26-set MAGUIRE apartment packageso crews install in sequence, without sorting.

Examen du DFM24h VE ProposalRoom-Numbered Packing

Built for High-Volume, High-Consistency Hotel Programs

A large hotel program does not need hundreds of unique doorsit needs hundreds of identical ones, delivered on sequence. Our 15,000Foshan factory is organized around exactly that.

01

1,000 ensembles de capacité flexible mensuelle

Four fully in-house workshopsaluminum machining, glass deep-processing, assembly, and automated packagingkeep quality and schedule under one roof, d'un échantillon de 10 séries au volume complet du programme.

02

Batch consistency across the whole run

Tooling and production records are retained for your account, so the last unit matches the firstand reorders come back identical in 20-25 jours.

03

Site-ready, floor-by-floor delivery

Room-number, produit, and position labeling on honeycomb cartons with reinforced wood crates, plus a spare-parts kit (rouleaux, scellés) and an illustrated installation manual in every pack.

Conformité organisée par marché, Prouvé par test

Hotel programs are approved market by market, so we present compliance the same waycertificates and test reports ship in every order’s documentation package.

Amérique du Nord

SGCC + ANSI Z97.1

SGCC (Conseil de certification des vitrages de sécurité) verre trempé certifié, aligné sur la norme ANSI Z97.1 sur les vitrages de sécurité référencée par les inspecteurs américains et canadiens.

Europe

CE + DANS 12150

Verre trempé marqué CE et fabriqué selon EN 12150, avec une documentation de conformité prête pour le transfert du projet.

Australie / Nouvelle-Zélande

AS/NZS 2208

Programmes de verre alignés sur AS/NZS 2208 pour les exigences du code du bâtiment australien et néo-zélandais.

Systèmes de gestion

OIN 9001 · 14001 · 45001

Qualité, environnemental, et santé au travail & gestion de la sécurité certifiée sur nos 15 000㎡ facilité.

SGCC Safety Glazing Certification Council mark
CE European Union safety certification mark
AS/NZS 2208 Australian and New Zealand glass standard mark
OIN 9001 quality management system certification
100,000 cycles Endurance push-pull des rouleaux
96H / 240H Essai de corrosion au brouillard salin
5 essais Régime de contrôle qualité interne par lot
3 systèmes OIN 9001 · 14001 · 45001
1 paquet Rapport de contrôle qualité + certificats par commande
How Hotel Programs Move

From Drawings to Delivery on a Predictable Clock

Clear SLAs are how we protect your opening date. This is the standard rhythm for a hospitality program, from first inquiry to reorder.

1 12H

Réponse à la demande

Chaque demande internationale a répondu dans les délais 12 heures by our 20-person sales team.

2 24H

DFM / VE Review

Structural review of your CAD drawings with a Value Engineering optimization proposal returned within 24 heures.

3 15 jours

Pre-Production Sample

Sample sets ready in 15 jours, so your team signs off on glass, matériel, and finish before volume.

4 30 jours

First Mass Order

First order completes in 30 jours across our 10-step production flow; reorders drop to 20-25 jours.

5 5 essais

QC & Documentation

Trempe, impact, drop, brouillard salin, and roller testingwith a QC report and SGCC/CE certificate copies per order.

6 Room

Sequenced Packing

Packed by room number, produit, and installation position, with a spare-parts kit and illustrated manual in every carton.

Hospitality Terms NDA & design protectionexclusive hotel designs are covered by an NDA, and your custom molds are retained for your reorders only. Paiement: 30% dépôt + 70% solde après inspection avant expédition.

Real Projects, Clients nommés, Measurable Results

Every hospitality program follows the same playbook: review the drawings, lock the standard, pack for the site. Here is what that looks like on two recent projects.

Canada MAGUIRE apartment bathroom with coordinated shower door, engineered-stone wall panel and custom shower base
Multi-FamilleCanadaseptembre 202526 Ensembles

Appartement MAGUIRE – 26 Complete Bathroom Sets

26 complete bathroom sets – robinets, showerheads, portes de douche, engineered-stone wall panels, and basesdelivered as one coordinated package in a unified finish, packed as independent kits labeled by room number and installation position.

« La santé a résolu bien plus que notre problème d’approvisionnement – ils ont rendu l'ensemble du système de salle de bain plus facile à installer et à entretenir.”

Olivia Bennett – Projet d'appartement MAGUIRE, Canada
Lire l'étude de cas du Canada
Custom glass office doors installed in the Dar es Salaam office building project, Tanzania
CommercialDar es SalaamJuin 2025~150 Sets

Immeuble de bureaux à Dar es Salaam – ~150 Custom Sets

Around 150 custom glass door and window sets: clear glazing for open areas, privacy treatment for meeting rooms, and facade-matched exterior windowspacked by floor and zone so installation ran in sequence.

“Health didn’t just supply door and window productsthey helped us control the most error-prone custom parts of our office project in advance.

Joseph MremaDar es Salaam Office Building Project
Read the Tanzania case study

Chosen by Five-Star Hospitality Groups

We have supplied shower-door and bathroom programs to hospitality groups across North America, Europe, Australie, and Southeast Asiaincluding the brands below.

Noms de marques affichés avec la permission du client.

FAQ

FAQ pour Hôtel & Acheteurs de projets

Six questions hotel and project buyers ask most oftencovering DFM drawing review, glass breakage risk, safety certification, project lead time, design confidentiality, and site-ready packaging. Appuyez sur une question pour lire notre réponse standard.

Can you help optimize our architect's initial bathroom drawings?

Pour l'architecte & PromoteurAbsolument. This is our core strength. We provide Design for Manufacturing (DFM) feedback. If your current drawing has a blind spot for waterproofing, our engineers will propose a structural modification before you finalize the spec.

How do you reduce glass breakage risk in a hotel environment?

For the Procurement ManagerWe use SGCC/CE certified tempered glass programs and controlled tempering processes to reduce internal stress and lower the risk of spontaneous breakage in demanding hotel environments.

What glass certification do we need to pass hotel inspection in North America or Europe?

For the Compliance & Procurement TeamPour l'Amérique du Nord, specify SGCC-certified tempered glass aligned with ANSI Z97.1; pour l'Europe, Verre de marché CE deux FR 12150. We supply both and include the certificate copies and QC test data in every order’s documentation package, so your inspector has supporting evidence on day one.

What are your sample and production lead times for a hotel project?

For the Project SchedulerLes échantillons sont prêts dans 15 jours. A first mass-production order completes in 30 jours, and reorders drop to 20-25 days because we retain your custom tooling. Every international inquiry is answered within 12 heures, and DFM feedback on your drawings is returned within 24 heures.

Can you keep our exclusive hotel design confidential?

Pour le développeur & Design TeamOui. We sign an NDA for exclusive hotel designs, and your custom molds are retained for your reorders onlythey are never reused for another buyer. Your program specifications stay yours.

How does your packaging reduce on-site rework on multi-room projects?

For the Site / Installation ManagerWe pack by room number, produit, and installation position instead of by product type. On the 26-set MAGUIRE apartment project, each bathroom arrived as an independent, room-labeled kit, so crews unloaded and installed in sequence without sorting or mixing unitsthe same logic we apply to hotel floor-by-floor delivery.

Retour en haut
Besoin d'un devis rapide? Discutez avec notre équipe export sur WhatsApp.
    • English
    • العربية
    • Français
    • Deutsch
    • Italiano
    • Русский
    • Español
    • ภาษาไทย