...

Fabricante de puertas de ducha de China para proyectos., al por mayor, y soporte OEM.

Five-Star Hotel Standard · SGCC & CE Certified

Hotel Shower Door Manufacturer for Five-Star Hospitality Projects

Engineered for Excellence, Trusted by Five-Star Hotels. From a 10-set sample run to 1,000 conjuntos de capacidad flexible mensual, we help hotel & apartment contractors pass inspection, prevent glass failures, and cut on-site rework – backed by SGCC/CE certified tempered glass and a DFM structural review before production starts.

Aerial view of a luxury resort with oval turquoise pool, hot tubs, lounge chairs and white red-tile-roof buildings
★★★★★

“Health solved more than procurement – they made our whole bathroom system easier to install and easier to maintain.” – Olivia Bennet, Proyecto Apartamento MAGUIRE (Canadá)

25+ años Hotel-Grade Manufacturing Since 1999
15,000㎡ Owned Foshan Factory, Full In-House Chain
1,000 conjuntos Monthly Flexible Project Capacity
190+ países Export Experience Worldwide
Riesgo & Resolución

What Derails Hotel Programs – Engineered Out Before Production

On a hospitality program, one failed inspection, one shattered panel, or one batch of mis-fitting doors can stall an entire opening. These are the three risks contractors raise with us most – and the answers we build into every order.

Riesgo 01 – Compliance
el riesgo

Failing the safety glass inspection

Inspectors in North America and Europe ask for certified glazing and documented proof. Missing paperwork stalls handover as surely as missing glass.

como lo eliminamos

SGCC + CE glass, documented by order

We supply SGCC (Consejo de certificación de acristalamiento de seguridad) certified tempered glass for North America and CE-marked glass for Europe, aligned with ANSI Z97.1 and EN 12150. Every order ships with a QC report, certificate copies, and test data – so your inspector has evidence on day one.

Certificado SGCCCE MarkedANSI Z97.1EN 12150
Riesgo 02 – Seguridad
el riesgo

Glass breakage in guest rooms

A spontaneous breakage in an occupied hotel room is a safety incident, a liability claim, and a brand problem – all at once.

como lo eliminamos

Xinyi substrates + controlled tempering

Every program starts from Xinyi glass substrates and runs a controlled tempering process, verified by tempering (fragmentation) and impact testing in our own lab. Anti-shatter safety glass is backed by a 5-year shower door warranty.

Xinyi Glass SubstratesTemper + Impact Tested5-Year Door Warranty
Riesgo 03 – Instalación
el riesgo

Drawings that don’t install

Waterproofing blind spots, tolerance drift, and opening conflicts discovered on site become rework across hundreds of identical bathrooms.

como lo eliminamos

DFM pre-check + room-numbered packing

Before cutting, our engineers run a DFM structural review of your CAD drawings and return a Value Engineering proposal within 24 horas. Then we pack by room number, producto, and installation position – the discipline we used on the 26-set MAGUIRE apartment package – so crews install in sequence, without sorting.

DFM Review24h VE ProposalRoom-Numbered Packing

Built for High-Volume, High-Consistency Hotel Programs

A large hotel program does not need hundreds of unique doors – it needs hundreds of identical ones, delivered on sequence. Our 15,000㎡ Foshan factory is organized around exactly that.

01

1,000 conjuntos de capacidad flexible mensual

Four fully in-house workshops – aluminum machining, procesamiento profundo de vidrio, asamblea, y embalaje automatizado – keep quality and schedule under one roof, from a 10-set sample run to full program volume.

02

Batch consistency across the whole run

Tooling and production records are retained for your account, so the last unit matches the first – and reorders come back identical in 20-25 días.

03

Site-ready, floor-by-floor delivery

Room-number, producto, and position labeling on honeycomb cartons with reinforced wood crates, plus a spare-parts kit (rodillos, sellos) and an illustrated installation manual in every pack.

Cumplimiento organizado por mercado, Probado por prueba

Hotel programs are approved market by market, so we present compliance the same way – certificates and test reports ship in every order’s documentation package.

América del norte

SGCC + ANSI Z97.1

SGCC (Consejo de certificación de acristalamiento de seguridad) vidrio templado certificado, alineado con el estándar de acristalamiento de seguridad ANSI Z97.1 al que hacen referencia los inspectores de EE. UU. y Canadá.

Europa

CE + EN 12150

Vidrio templado con marcado CE fabricado según EN 12150, con documentación de conformidad lista para la entrega del proyecto.

Australia / Nueva Zelanda

AS/Nueva Zelanda 2208

Programas de vidrio alineados con AS/NZS 2208 para los requisitos de los códigos de construcción de Australia y Nueva Zelanda.

Sistemas de Gestión

ISO 9001 · 14001 · 45001

Calidad, ambiental, y salud ocupacional & Gestión de seguridad certificada en nuestros 15.000㎡ instalación.

Marca del Consejo de Certificación de Acristalamiento de Seguridad SGCC
Marca de certificación de seguridad CE de la Unión Europea
AS/Nueva Zelanda 2208 Marca estándar de vidrio de Australia y Nueva Zelanda
ISO 9001 certificación del sistema de gestión de calidad
100,000 ciclos Resistencia al vaivén del rodillo
96h / 240h Prueba de corrosión por niebla salina
5 pruebas Régimen de control de calidad interno por lote
3 sistemas ISO 9001 · 14001 · 45001
1 embalar informe de control de calidad + certificados por pedido
How Hotel Programs Move

From Drawings to Delivery on a Predictable Clock

Clear SLAs are how we protect your opening date. This is the standard rhythm for a hospitality program, from first inquiry to reorder.

1 12h

Respuesta a la consulta

Every international inquiry answered within 12 horas by our 20-person sales team.

2 24h

DFM / VE Review

Structural review of your CAD drawings with a Value Engineering optimization proposal returned within 24 horas.

3 15 días

Pre-Production Sample

Sample sets ready in 15 días, so your team signs off on glass, hardware, and finish before volume.

4 30 días

First Mass Order

First order completes in 30 días across our 10-step production flow; reorders drop to 20-25 días.

5 5 pruebas

control de calidad & Documentación

Templado, impacto, drop, spray de sal, y pruebas de rodillos – with a QC report and SGCC/CE certificate copies per order.

6 Room №

Sequenced Packing

Packed by room number, producto, and installation position, with a spare-parts kit and illustrated manual in every carton.

Hospitality Terms Acuerdo de confidencialidad & design protection – exclusive hotel designs are covered by an NDA, and your custom molds are retained for your reorders only. Pago: 30% depósito + 70% Saldo después de la inspección previa al envío..

Real Projects, Clientes nombrados, Measurable Results

Every hospitality program follows the same playbook: review the drawings, lock the standard, pack for the site. Here is what that looks like on two recent projects.

Canada MAGUIRE apartment bathroom with coordinated shower door, engineered-stone wall panel and custom shower base
Multi-FamilyCanadáseptiembre 202526 Conjuntos

Apartamento MAGUIRE – 26 Complete Bathroom Sets

26 complete bathroom sets – grifos, cabezales de ducha, puertas de ducha, engineered-stone wall panels, and bases – delivered as one coordinated package in a unified finish, packed as independent kits labeled by room number and installation position.

“La salud resolvió más que nuestro problema de adquisiciones – hicieron que todo el sistema de baño fuera más fácil de instalar y mejor de mantener.”

Olivia Bennet – Proyecto Apartamento MAGUIRE, Canadá
Lea el estudio de caso de Canadá
Puertas de oficina de vidrio personalizadas instaladas en el proyecto de edificio de oficinas de Dar es Salaam, Tanzania
ComercialDar es SalaamJunio 2025~150 juegos

Edificio de oficinas de Dar es Salaam – ~150 conjuntos personalizados

Alrededor 150 custom glass door and window sets: clear glazing for open areas, privacy treatment for meeting rooms, and facade-matched exterior windows – packed by floor and zone so installation ran in sequence.

“La salud no se limitaba a suministrar productos para puertas y ventanas – nos ayudaron a controlar de antemano las partes personalizadas más propensas a errores de nuestro proyecto de oficina.”

Joseph Mréma – Proyecto de edificio de oficinas en Dar es Salaam
Lea el estudio de caso de Tanzania

Chosen by Five-Star Hospitality Groups

We have supplied shower-door and bathroom programs to hospitality groups across North America, Europa, Australia, and Southeast Asia – including the brands below.

Nombres de marcas mostrados con permiso del cliente..

Preguntas frecuentes

Preguntas frecuentes para Hotel & Compradores de proyectos

Six questions hotel and project buyers ask most often – covering DFM drawing review, glass breakage risk, safety certification, project lead time, design confidentiality, and site-ready packaging. Toque una pregunta para leer nuestra respuesta estándar.

Can you help optimize our architect's initial bathroom drawings?

Para el arquitecto & ReveladorAbsolutamente. This is our core strength. We provide Design for Manufacturing (DFM) feedback. If your current drawing has a blind spot for waterproofing, our engineers will propose a structural modification before you finalize the spec.

How do you reduce glass breakage risk in a hotel environment?

Para el gerente de adquisicionesWe use SGCC/CE certified tempered glass programs and controlled tempering processes to reduce internal stress and lower the risk of spontaneous breakage in demanding hotel environments.

What glass certification do we need to pass hotel inspection in North America or Europe?

For the Compliance & Procurement TeamPara América del Norte, specify SGCC-certified tempered glass aligned with ANSI Z97.1; para Europa, CE mercado vidrio dos EN 12150. We supply both and include the certificate copies and QC test data in every order’s documentation package, so your inspector has supporting evidence on day one.

What are your sample and production lead times for a hotel project?

For the Project SchedulerSamples are ready in 15 días. A first mass-production order completes in 30 días, and reorders drop to 20-25 days because we retain your custom tooling. Cada consulta internacional es respondida dentro de 12 horas, and DFM feedback on your drawings is returned within 24 horas.

Can you keep our exclusive hotel design confidential?

Para el desarrollador & Design TeamSí. We sign an NDA for exclusive hotel designs, and your custom molds are retained for your reorders only – they are never reused for another buyer. Your program specifications stay yours.

How does your packaging reduce on-site rework on multi-room projects?

For the Site / Installation ManagerWe pack by room number, producto, and installation position instead of by product type. On the 26-set MAGUIRE apartment project, each bathroom arrived as an independent, room-labeled kit, so crews unloaded and installed in sequence without sorting or mixing units – the same logic we apply to hotel floor-by-floor delivery.

Volver arriba
Necesita una cotización rápida? Chatea con nuestro equipo de exportación por WhatsApp.
    • English
    • العربية
    • Français
    • Deutsch
    • Italiano
    • Русский
    • Español
    • ภาษาไทย