ผู้ผลิตประตูห้องอาบน้ำจีนสำหรับโครงการ, ขายส่ง, และการสนับสนุน OEM.

190+ Countries · 11 Hotel Brands · 25+ ปี

Project Engineering for Hotels, Apartments & Commercial Buildings

Full-chain manufacturing from aluminum processing to glass deep-processing, assembly, และบรรจุภัณฑ์. SGCC and CE certified. Sample in 15 วัน, bulk order in 30 วัน. Every project backed by drawing review, zone-based packing, and 5-year warranty.

KJbath project engineering team reviewing drawings at workstation in Foshan factory
★★★★★

Health helped us solve not just procurement, but made the entire bathroom system easier to install and maintain.— Olivia Bennett, Canada Apartment Project

190+ ประเทศส่งออก & Regions
11 brands โรงแรม & Hospitality Partners
25+ yrs Manufacturing Since 1999
15,000m² Self-Owned Factory, ฝอซาน
01 Featured Projects

Three named projects, documented from drawing review to site handover.

Every entry links to a full case study with real unit counts, packaging logic and a signed client testimonialnot just a finished photo and a hotel name.

MAGUIRE Apartment bathroom project in Canada — matched shower enclosure, solid-surface wall panels and shower base supplied as one coordinated package
เลขที่. 01อพาร์ตเมนต์ · แคนาดา · Sept 2025

MAGUIRE Apartment Bathroom Package

26 complete bathroom sets — ก๊อกน้ำ, shower heads, ประตูห้องอาบน้ำ, artificial-stone wall panels and basesunified in finish and packed per unit by room number, product and installation position to cut on-site sorting and rework.

26Bathroom sets
“Health made the entire bathroom system easier to install and maintain.— โอลิเวีย เบนเน็ตต์, ลูกค้า
Read the full case
Installed glass office door and full-height window wall at the Dar es Salaam office building project, แทนซาเนีย
เลขที่. 02ทางการค้า · แทนซาเนีย · มิถุนายน 2025

Dar es Salaam Office Building Doors & Windows

รอบๆ 150 custom glass door and window setsdrawing review before production, zone-based engineering (open offices transparent, meeting rooms private and acoustically separated, windows matched to the facade), packed by floor and zone.

~150ประตู & window sets
“Health controlled the easiest-to-get-wrong custom steps before production.Joseph Mrema, ลูกค้า
Read the full case
Waterview Beach Apartment in Dee Why, Australia — custom glass balcony balustrade system built for salt-spray coastal exposure
เลขที่. 03Coastal Residential · ออสเตรเลีย · 2025

Waterview Beach Apartment Balcony Railings

Custom glass balcony railing system at Dee Why, นิวเซาธ์เวลส์ — engineered for high salt-spray, humidity and strong sea winds, with transparent glass preserving the ocean view and zone-plus-floor packaging for an occupied building.

240ชม.Salt-spray test standard
“Health understands what coastal apartment projects really worry about.— อีธาน คลาร์ก, ลูกค้า
Read the full case
02 Project Capability

Why project teams stay after the first order.

Capacity is easy to claim. What matters is how drawings, batching, packing and compliance are coordinated before production scalesacross four in-house workshops under one 15,000 m² roof.

Robotic vacuum suction arms lifting large glass panels in the KJbath factory with glass storage racks and forklift behind
Glass deep-processingone of four in-house workshops
4In-house workshops

Full industry chain, no outsourced bottlenecks

Aluminum machining, glass deep-processing, assembly and automated packaging run under one roofa 151-person team (20 ฝ่ายขาย, 12 ร&ง, 120 การผลิต) delivering 1,000 sets/month of flexible capacity from Xinyi glass base sheets.

5QC tests per batch

Compliance documented for your market

SGCC for North America, CE for Europe; glass tested to ANSI Z97.1, ใน 12150 and AS/NZS 2208. Every shipment includes a QC report with tempering, impact and salt-spray data (96 h standard, 240 h coastal) plus certificate copies.

12ชม.Inquiry response

SLAs you can plan a project around

Every international inquiry answered within 12 ชั่วโมง. Samples in 15 วัน, first bulk order in 30, reorders in 20–25. Payment: 30% deposit, 70% balance after pre-shipment inspection.

5-yrDoor warranty

Backed long after handover

5-year shower door warranty, 3-year hardware warranty, lifetime online technical support. NDA protection for exclusive hotel designs, with custom molds retained for your reorders.

03 How Cooperation Works

From inquiry to after-sales on a predictable clock.

The same six milestones run on every projectwith the lead times we commit to contractually, from a 10-set sample run to full program volume.

≤ 12 h reply

Inquiry

Send your BOQ, drawings or specs. Every international inquiry answered within 12 ชั่วโมง.

Before production

DFM Review

CAD check, DFM / value-engineering suggestions and zone-based planning on your drawings.

15 วัน

Sampling

Prototype in 15 วัน. Confirm finish, size and hardware before mass production starts.

30 d first · 20–25 d reorder

การผลิตจำนวนมาก

1,000 sets/month flexible capacity across four workshops, running a documented 10-step production flow.

5 tests

QC & เอกสารประกอบ

Tempering, impact, packaging drop, salt-spray (96 ชม. / 240 h coastal) and 100,000-cycle sliderreported per order.

Roompacking

บรรจุภัณฑ์ & โลจิสติกส์

Honeycomb carton + reinforced wood crate, numbered by room, zone or floor, with a spare-parts kit and illustrated manual.

Payment: 30% deposit + 70% after pre-shipment inspection การรับประกัน: 5-year shower door / 3-year hardware สนับสนุน: 24 h technical response, lifetime online OEM / โอเอ็มเอ็ม: NDA + custom molds retained for reorders

Trusted by hospitality brands

11 hotel and hospitality brands specify our products across multiple marketsexports to 190+ countries and regions since 1999.

ฮิลตัน แมริออท Hyatt Doubletree Hilton Garden Inn Embassy Suite Hotel Element Firekeepers Casino Hotel Nova Panamonte San Dimas เริ่มโครงการของคุณ →

Brand names shown with client permission.

คำถามที่พบบ่อย

คำถามที่พบบ่อยเกี่ยวกับ project delivery

Four questions our buyers ask most often — covering multi-unit capacity, packaging logic, regional compliance, and lead times. แตะคำถามเพื่ออ่านคำตอบมาตรฐานของเรา.

Can you handle large commercial or multi-unit custom projects?

For project teamsใช่. Our 15,000m² factory runs four in-house workshops (aluminum, กระจก, assembly, packaging) กับ 1,000 sets/month capacity. The key is not just capacity but how drawings, batching, packing, and zone logic are coordinated before production scales. Our Tanzania office-building case delivered approximately 150 sets of custom glass doors with floor-by-floor zone numbering.

How do you manage packaging for mixed room types or multiple zones?

For apartment and hotel buyersPackaging follows the delivery logic of the site, not just factory convenience. In our Canada MAGUIRE case (26 ชุด), each unit was packed independently with room number, product list, and installation position labeled — reducing on-site sorting and rework. For the Australia coastal project, packing was sequenced by balcony zone and floor to minimize disruption in an occupied building.

Do you have experience with regional compliance and environmental constraints?

For international developersใช่. We hold SGCC (ทวีปอเมริกาเหนือ), ส.ศ (ยุโรป), and test glass to ANSI Z97.1, ใน 12150, and AS/NZS 2208. For coastal projects like our Australia case, hardware is specified for high salt-spray and humidity exposure (tested to 240h salt-spray standard for coastal environments). Regional humidity, corrosion exposure, and market-specific review requirements all influence material and project preparation.

What are your lead times and warranty terms for project orders?

For procurement managersSample lead time is 15 วัน. First bulk order ships in 30 วัน; reorders in 20–25 days. Payment terms: 30% deposit + 70% balance after pre-shipment inspection. การรับประกัน: 5 years on shower doors, 3 years on hardware components, with lifetime online technical support. Every shipment includes a QC report, SGCC/CE certificate copy, illustrated installation manual, and a spare-parts kit (rollers + seals).

กลับไปด้านบน
ต้องการใบเสนอราคาด่วน? แชทกับทีมส่งออกของเราบน WhatsApp.