الشركة المصنعة لباب الدش في الصين للمشاريع, بالجملة, ودعم صانعي القطع الأصلية.

190+ Countries · 11 Hotel Brands · 25+ سنين

Project Engineering for Hotels, Apartments & Commercial Buildings

Full-chain manufacturing from aluminum processing to glass deep-processing, حَشد, والتعبئة والتغليف. SGCC and CE certified. Sample in 15 أيام, bulk order in 30 أيام. Every project backed by drawing review, zone-based packing, and 5-year warranty.

KJbath project engineering team reviewing drawings at workstation in Foshan factory
★★★★★

Health helped us solve not just procurement, but made the entire bathroom system easier to install and maintain.— Olivia Bennett, Canada Apartment Project

190+ دول التصدير & Regions
11 brands الفندق & Hospitality Partners
25+ سنوات Manufacturing Since 1999
15,000m² Self-Owned Factory, فوشان
01 Featured Projects

Three named projects, documented from drawing review to site handover.

Every entry links to a full case study with real unit counts, packaging logic and a signed client testimonialnot just a finished photo and a hotel name.

MAGUIRE Apartment bathroom project in Canada — matched shower enclosure, solid-surface wall panels and shower base supplied as one coordinated package
لا. 01شقة · كندا · سبتمبر 2025

MAGUIRE Apartment Bathroom Package

26 اطقم حمامات كاملة — حنفيات, shower heads, أبواب الاستحمام, artificial-stone wall panels and basesunified in finish and packed per unit by room number, product and installation position to cut on-site sorting and rework.

26Bathroom sets
“Health made the entire bathroom system easier to install and maintain.— أوليفيا بينيت, Client
Read the full case
Installed glass office door and full-height window wall at the Dar es Salaam office building project, تنزانيا
لا. 02تجاري · تنزانيا · يونيو 2025

Dar es Salaam Office Building Doors & Windows

حول 150 مجموعات الأبواب والنوافذ الزجاجية المخصصة — drawing review before production, zone-based engineering (open offices transparent, meeting rooms private and acoustically separated, windows matched to the facade), packed by floor and zone.

~150باب & window sets
“Health controlled the easiest-to-get-wrong custom steps before production.— جوزيف مريما, Client
Read the full case
Waterview Beach Apartment in Dee Why, Australia — custom glass balcony balustrade system built for salt-spray coastal exposure
لا. 03Coastal Residential · أستراليا · 2025

Waterview Beach Apartment Balcony Railings

Custom glass balcony railing system at Dee Why, NSWengineered for high salt-spray, humidity and strong sea winds, with transparent glass preserving the ocean view and zone-plus-floor packaging for an occupied building.

240حSalt-spray test standard
“Health understands what coastal apartment projects really worry about.Ethan Clarke, Client
Read the full case
02 Project Capability

Why project teams stay after the first order.

Capacity is easy to claim. What matters is how drawings, batching, packing and compliance are coordinated before production scalesacross four in-house workshops under one 15,000 m² roof.

Robotic vacuum suction arms lifting large glass panels in the KJbath factory with glass storage racks and forklift behind
Glass deep-processingone of four in-house workshops
4In-house workshops

Full industry chain, no outsourced bottlenecks

Aluminum machining, المعالجة العميقة للزجاج, assembly and automated packaging run under one roofa 151-person team (20 مبيعات, 12 ر&د, 120 إنتاج) delivering 1,000 sets/month of flexible capacity from Xinyi glass base sheets.

5QC tests per batch

Compliance documented for your market

SGCC for North America, CE for Europe; glass tested to ANSI Z97.1, في 12150 and AS/NZS 2208. Every shipment includes a QC report with tempering, impact and salt-spray data (96 h standard, 240 h coastal) plus certificate copies.

12حInquiry response

SLAs you can plan a project around

تم الرد على كل استفسار دولي في الداخل 12 ساعات. Samples in 15 أيام, first bulk order in 30, reorders in 20–25. قسط: 30% إيداع, 70% التوازن بعد التفتيش قبل الشحن.

5-yrDoor warranty

Backed long after handover

5-ضمان باب الدش لمدة سنة, 3-year hardware warranty, lifetime online technical support. NDA protection for exclusive hotel designs, with custom molds retained for your reorders.

03 How Cooperation Works

From inquiry to after-sales on a predictable clock.

The same six milestones run on every projectwith the lead times we commit to contractually, من عينة مكونة من 10 مجموعات إلى حجم البرنامج الكامل.

≤ 12 h reply

Inquiry

Send your BOQ, drawings or specs. تم الرد على كل استفسار دولي في الداخل 12 ساعات.

Before production

مراجعة سوق دبي المالي

CAD check, سوق دبي المالي / value-engineering suggestions and zone-based planning on your drawings.

15 أيام

Sampling

Prototype in 15 أيام. Confirm finish, size and hardware before mass production starts.

30 d first · 20–25 d reorder

إنتاج متسلسل

1,000 sets/month flexible capacity across four workshops, running a documented 10-step production flow.

5 الاختبارات

مراقبة الجودة & توثيق

هدأ, تأثير, packaging drop, رذاذ الملح (96 ح / 240 h coastal) and 100,000-cycle sliderreported per order.

غرفة № packing

التعبئة والتغليف & اللوجستية

Honeycomb carton + reinforced wood crate, numbered by room, zone or floor, with a spare-parts kit and illustrated manual.

قسط: 30% إيداع + 70% after pre-shipment inspection ضمان: 5-year shower door / 3-year hardware يدعم: 24 h technical response, lifetime online تصنيع المعدات الأصلية / أوديإم: التجمع الوطني الديمقراطي + custom molds retained for reorders

Trusted by hospitality brands

11 hotel and hospitality brands specify our products across multiple marketsexports to 190+ countries and regions since 1999.

هيلتون Marriott Hyatt Doubletree Hilton Garden Inn Embassy Suite Hotel Element فندق كازينو رجال الإطفاء Nova Panamonte San Dimas ابدأ مشروعك →

أسماء العلامات التجارية المعروضة بإذن العميل.

الأسئلة الشائعة

Frequently asked questions about project delivery

Four questions our buyers ask most often — covering multi-unit capacity, packaging logic, regional compliance, and lead times. اضغط على سؤال لقراءة إجابتنا القياسية.

Can you handle large commercial or multi-unit custom projects?

For project teamsنعم. Our 15,000m² factory runs four in-house workshops (aluminum, زجاج, حَشد, packaging) مع 1,000 sets/month capacity. The key is not just capacity but how drawings, batching, packing, and zone logic are coordinated before production scales. Our Tanzania office-building case delivered approximately 150 sets of custom glass doors with floor-by-floor zone numbering.

How do you manage packaging for mixed room types or multiple zones?

For apartment and hotel buyersPackaging follows the delivery logic of the site, not just factory convenience. In our Canada MAGUIRE case (26 مجموعات), each unit was packed independently with room number, product list, and installation position labeled — reducing on-site sorting and rework. For the Australia coastal project, packing was sequenced by balcony zone and floor to minimize disruption in an occupied building.

Do you have experience with regional compliance and environmental constraints?

For international developersنعم. We hold SGCC (أمريكا الشمالية), م (أوروبا), and test glass to ANSI Z97.1, في 12150, and AS/NZS 2208. For coastal projects like our Australia case, hardware is specified for high salt-spray and humidity exposure (tested to 240h salt-spray standard for coastal environments). Regional humidity, corrosion exposure, and market-specific review requirements all influence material and project preparation.

What are your lead times and warranty terms for project orders?

For procurement managersSample lead time is 15 أيام. First bulk order ships in 30 أيام; reorders in 20–25 days. Payment terms: 30% إيداع + 70% التوازن بعد التفتيش قبل الشحن. ضمان: 5 years on shower doors, 3 years on hardware components, with lifetime online technical support. Every shipment includes a QC report, SGCC/CE certificate copy, illustrated installation manual, and a spare-parts kit (بكرات + الأختام).

العودة إلى الأعلى
بحاجة إلى اقتباس سريع? قم بالدردشة مع فريق التصدير لدينا على WhatsApp.